Quarrypeak Credit, which arranges small-business funding in Morristown, TN, explains how a manufacturing business in Hamblen County, TN can improve its cash flow: shortening the receivable wait, buying materials against orders, financing machines over their working life and using a line of credit for the gap. Manufacturing had the county's largest payroll in 2023.
Manufacturing in Hamblen County, TN by the numbers
County Business Patterns counted 84 manufacturing employer establishments in Hamblen County, TN in 2023, with about 10,343 employees and annual payroll of $549,985,000, the largest payroll of any sector. Only 16.7% had fewer than five employees; the other 83.3% had five or more (our arithmetic). Among them were 12 fabricated metal product manufacturers, the group that includes machine shops, with about 303 employees, and 4 food manufacturers with about 2,525 employees.
Nonemployer Statistics counted 70 manufacturing businesses with no employees in the county in 2024, a separate program and year. A smaller shop that supplies a larger buyer carries that buyer's payment terms, and for that shop the terms are where cash gets tight.
Where the cash gets stuck
Follow a single order. Raw material is bought, often on short supplier terms. It sits in the shop as work in progress while people and machines turn it into parts. The finished parts ship, and an invoice goes out on the customer's terms, which can be 30, 45 or 60 days or longer for a large buyer. Every one of those stages holds cash.
The cash conversion cycle adds them up: days of inventory, plus days to collect receivables, minus days you take to pay suppliers. A shorter cycle frees cash without borrowing a dollar.
1. Shorten the receivable wait
- Invoice the day an order ships, not at month end.
- Ask for progress billing or a deposit on long jobs and new tooling.
- Check whether a large customer offers early payment for a discount, and price whether it is worth it.
- Track days to collect by customer; one slow payer can hold more cash than the rest combined.
2. Buy materials against orders
Buying metal or resin in bulk for a discount only helps if the stock turns. Tie large material buys to confirmed orders where you can, and keep a short list of the materials worth stocking. Where a large order requires a big buy up front, that is a natural use of working capital for manufacturing, repaid when the order is paid.
3. Finance machines over their working life
Paying cash for a machine can drain the money needed for the material and payroll it will consume. Manufacturing equipment financing spreads the cost over the years the machine works, usually with the machine as collateral. Business loans for manufacturing equipment and leases are covered on the equipment financing page, and the CNC machine payment calculator shows the monthly payment, total interest and total cost including the down payment for any quote.
4. Use a line of credit for the receivable gap
When the gap repeats with every big order, a revolving line fits better than a lump sum: draw when material is bought, repay when the customer pays. For a single large order, a short working capital loan sized to that order can be simpler.
A labeled example: a shop's cash conversion cycle
Made-up figures for illustration; not an offer. A Morristown, TN machine shop holds material and work in progress for about 25 days, collects from its main customer in about 50 days, and pays its steel supplier in about 30. Its cycle is 25 plus 50 minus 30: 45 days of cash tied up in every order. On a $60,000 monthly volume of costs, that is roughly $90,000 that has to come from somewhere.
In that illustration, cutting collection to 40 days, by invoicing on shipment and pressing for progress billing on new jobs, shortens the cycle to 35 days and frees about $20,000, without any new funding.
CNC machine financing for a Hamblen County, TN job shop
Made-up figures for illustration; not an offer. A job shop finds a used vertical machining center for $95,000. With 10% down, $85,500 is financed; spread over 60 months, the principal alone is $1,425 a month, before the partner's rate and fees. The CNC machine payment calculator adds a rate to those inputs.
The machine has to pay for itself in spindle hours. If the shop can bill it 25 hours a week at a made-up $85 an hour, it brings in about $9,200 a month, enough to see whether the payment, tooling and power fit with room to spare. Partners will ask for the quote with the serial number and control hours, and for the orders the machine is meant to run.
When to borrow, and for what
Borrow for timing gaps you can name and close, and for machines that will earn more than they cost. Do not borrow to cover a margin problem; a line that is never repaid is a sign that prices or costs need attention first. Compare the shapes on the funding options page, and see the county's wider picture on the Morristown, TN page.
By Quarrypeak Credit · Updated